Laserfiche WebLink
Findings of the <br />Colorado Mined Land Reclamation Division <br />for <br />COLOWYO COAL MINE <br />EXPLANATION OF FINDINGS <br />Pursuant to Rule 2.07.6(2) of the Regulations <br />Reclamation Board for Coal Mining, and the ap <br />Land Reclamation Division or the Board must m <br />prior to issuance of a permit, permit renewal <br />findings are based on information made avails <br />demonstrates that the applicant will be able <br />Colorado Surface Coal Mining Reclamation Act <br />pursuant to the Act. <br />of the Colorado Mined Land <br />proved state program, the Mined <br />ake specific written findings <br />or permit revision. These <br />ble to the Division that <br />to operate in compliance with the <br />and the Regulations promulgated <br />The findings in the following sections required by Rule 2.07.6(2) are listed <br />in accordance with that Rule. The findings and specific approvals required <br />pursuant to Rule 2.07.6(2)(m) are listed in accordance with Rule 4 and are <br />organized under subject or discipline subtitles. <br />This findings document has been updated for this permit revision. The <br />following findings have been reevaluated and updated if necessary to reflect <br />changes which will occur as a result of this permit revision. <br />SECTION A <br />Findings Required by Rule 2.07.6(2) <br />The permit application 1s accurate and complete. All requirements of the <br />Act and these rules have been complied with (2.07.6(2)(a)). <br />Based on information contained in the permit application and other <br />information available to the Division, the Division finds that surface <br />coal mining and reclamation can be feasibly accomplished at the Colowyo <br />Mine (2.07.6(2)(b)>. <br />The assessment of the probable cumulative impacts of all anticipated coal <br />mining in the general area on the hydrologic balance, as described in <br />2.05.6(3), has been made by the Division. This assessment, entitled <br />"Yampa River Cumulative Hydrologic Impact Statement," is available for <br />Inspection at the offices of the Division. The Division finds that the <br />operations proposed under the application have been designed to prevent <br />damage to the hydrologic balance outside the proposed permit area <br />(2.07.6(2)(c)). <br />The Division finds that the permit area is, subject to valid rights <br />existing as of August 3, 1977, not within: <br />a) An area designated unsuitable for surface coal mining operations <br />b) An area under study for designation as unsuitable for surface coal <br />mining operations (2.07.6(2>(d)(11)); <br />