Laserfiche WebLink
SECTION 2 <br />Site Map <br />Once the site is disturbed and stormwater requires control, a FIGURE 1: Site Map will be <br />created. FIGURE 1 will indicate site-specific characteristics and BMPs implemented. The site <br />has been determined to be within a single drainage area. Directions of stormwater flow, location <br />of all surface water bodies, inflow areas, and outflow areas will be indicated on FIGURE 1. <br />The following is a list of specific information to be included on the Site Map: <br />/ Site boundary <br />/ Access & haulroads <br />/ Stormwater outfalls and an outline of each drainage area for each outfall <br />/ An estimate of the direction of flow <br />/ Material handling azeas <br />/ Each structural control measure to help reduce pollutants in stormwater runoff <br />/ Areas used for storage or disposal of overburden, materials, soils, or wastes <br />/ Areas used for mineral milling & processing <br />/ Springs, streams, wetlands and other surface waters <br />/ Location of mine drainage or any other process water dischazge points <br />/ Boundary of tributary area that is subject to effluent limitations <br />/ Date the map was prepazed and subsequent revision dates <br />Riverbend <br />Storm Wa[er Management Plan <br />Page 6 of 19 <br />