My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-03-14_REVISION - M2000016 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2005-03-14_REVISION - M2000016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:24 PM
Creation date
11/21/2007 2:43:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
3/14/2005
Doc Name
Industrial Activities & Stormwater Management Controls
From
Lafarge West Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
without mineral filler. The binder material used is normally asphalt cement but can also <br />be an asphalt emulsion or one of a variety of modified materials. Various additives, <br />including liquid and powdered materials, can also be incorporated into the mixture. <br />Activities at these sites may include the following: raw material unloading into <br />stockpiles or storage tanks, raw material feed to plant, material batching, raw material <br />storage area, recyclable asphalt disposal azea, truck wash out, and water supply and <br />settling lakes. <br />^ READY MIXED CONCRETE, CENTRAL BATCHING <br />These operations mix sand, gravel, cement, and water together to form ready mix <br />concrete, which is then hauled to off-site construction projects. <br />The raw materials are made up of sand, gravel, cement, water and additives. The sand <br />and gravel is either stored in stockpiles located outside and fed into the plant via loaders <br />and conveyors, or it is stored directly in a series of hoppers located directly above the <br />central plant. The remainder of the raw materials is stored in tanks to protect them from <br />exposure to moisture and temperature until they are pumped into the mixer. Once the <br />raw materials aze fed into the central mixer and combined to form Ready Mix concrete, <br />the final product is placed within trucks and removed from the site. <br />/ READY MIXED CONCRETE, DRY BATCHING <br />These operations apportion out a mix of sand, gravel, cement, and water together, which <br />is then mixed within the truck to form Ready Mixed concrete that is hauled to off-site <br />construction projects. <br />The raw materials are made up of sand, gravel, cement, water and additives. The sand <br />and gravel is either stored in stockpiles located outside and fed into the plant via loaders <br />and conveyors, or it is stored directly in a series of hoppers located directly above the <br />central plant. The remainder of the raw materials is stored in tanks to protect them from <br />exposure to moisture and temperature until they are pumped into the mixer. Dry batching <br />then apportions out and dumps the raw materials into the concrete truck-mounted mixer <br />where it is continually agitated and mixed to keep it from hardening before it arrives on <br />the assigned job site. <br />/ EQUIPMENT FUELING <br />Diesel and/or gasoline tanks aze located on site for fueling of equipment. Off-site <br />vendors refill tanks as needed. <br />/ EQUIPMENT MAINTENANCE <br />The site contains a shop area where necessary maintenance can be conducted for site <br />equipment. Typical chemicals associated with maintenance, such as used oil, antifreeze, <br />motor oil, hydraulic oil, brake fluid, etc, may be stored on site as needed. All chemicals <br />are stored in such a manner as to prevent materials from mixing with stormwater or being <br />accidentally dischazged off site or to waters of the U.S. <br />Riverbend <br />Storm Water Management Plan <br />Page 5 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.