Laserfiche WebLink
<br />MINE SITE EVALUATION INSPECTION REPORT - PAGE 4 <br />Mu±~~er Canyon Mine <br />F. Does the mining and reclamation plan for the permit comply <br />with the approved State Program? yes X no <br />If no, explain <br />Do conditions exist that are not adequately addressed in the <br />permit? yes no X <br />I£ yes, explain <br />G. Indicate State inspection frequency for this annual <br />review period. <br />Number of completes <br />Number of partials <br />1 <br />H. Comments and recommendations A reduced crew was maintain- <br />ing the mine Facilities; no coal was being mined at the time of the <br />inspection. See attached narrative for a description of the violations <br />noted in the Ten-Day Notice. The mine permit includes the Loma rail <br />loadout.' <br />, IV. ENFORCEMENT INFORMATION - FEDERAL <br />1. 10-Day Notice Number <br />2. NOV Number <br />3. CO Number <br />83-2-0-2 <br />V. VIOLATION CODES <br />ATO SM BG HE RG IF TH SP EL WM BZ RD DM BL RVG SD MLJP EP DP OV <br />~~ X <br />