Laserfiche WebLink
<br /> <br />MINE SITE EVAL UATION IPISPBCTIO~I REPORT ~ PAGE 3 <br />'1•IUncjer Canyon Mine <br />B. Performance standards that assure re clamation quality and <br />timelines s: <br />1 1. Topsoil handling 1 7. Timing of <br />1 2. Backfilling & grading revegetation <br />1 3. Timing of reclamation 1 8. High~:~all <br />1 4. Success of revegetation elimination <br />1 5. Disposal of excess spoil 5 9. Downslope <br />1 6. Handling of ar_id or spoil disposal <br /> toxic materials 1 10. Post mining <br /> land use <br />C. For each standard marked (2), what action(s) has the State <br />taken to cause the violation to be corrected? <br />D. For each standard marked (3), indicate what action(s) the <br />State should have taken. <br />E. For each standard marked (4), explain why it is unknown <br />whether or not the State has failed to take appropriate <br />action. <br />Ten-Day Notice No. 83-2-0-2 was issued for failure to control diversion <br />discharges to reduce erosion, failure to implement measures approved in <br />the permit in accordance with the included timetable, and failure to <br />maintain support facilities to prevent or reduce erosion and siltation. <br />The notice was issued to the State on 5 31 83 and the State has not yet <br />had an opportunity to respond to the notice. <br /> <br />