My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-04-23_REVISION - M1985029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2004-04-23_REVISION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:32 PM
Creation date
11/21/2007 2:41:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
Revision
Doc Date
4/23/2004
Doc Name
Responses to Adequacy Review
From
Greg Lewicki and Associates
To
DMG
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The spreading of fines will occur from Fines Piles #2 and #3, located near the processing plant <br />azea. A thickness of 3" over 23.4 acres is a volume of 9,438 cy. This volume will be spread over <br />the designated azeas with a small dozer to minimize compaction. <br />The reclamation timetable is given below, assuming that all cuts have economic viability and <br />will be mined. <br />Task # Description Time Needed <br />in months <br />1 Strip Initial overburden from Cut 1 and place to the north- <br />east. Regrade this northeast azea. 1.0 <br />2 Mine Cut 1. Create new Pond A. 0.5 <br />3 Mine Cut 2. Very little overburden. 1.0 <br />4 Create 8' gravel berm along Highway 9 ROW 0.5 <br />5 Create Ponds 1,2,3,4 on southwest corner of permit azea 1.0 <br />6 Strip overburden from Cut 3 and place in Cut 1. Move <br />Pond A back to Cut 2 azea. 1.5 <br />7 Mine cuts 4-47 stripping and replacing topsoil & overbuy- <br />den in the previous cut. 64.5 <br />8 Smooth last cut with gravel from surrounding azea, create <br />lake 1.5 <br />9 Remove trailers and tanks from camp azea 1.0 <br />10 Remove shop and processing building, conveyors, pipe- <br />lines 2.0 <br />11 Smooth 600' gravel berm from property along Highway 9 0.5 <br />12 Smooth sediment ponds #1, #3 and #4 into one pond 0.5 <br />13 Backfill Pond #2 0.5 <br />14 Remove all mobile equipment from site 0.5 <br />15 Re- topsoil 23.4 acres of land from Fines Piles #2 and #3 2.0 <br />Alma Placer 7/03 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.