My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-04-23_REVISION - M1985029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2004-04-23_REVISION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:32 PM
Creation date
11/21/2007 2:41:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
Revision
Doc Date
4/23/2004
Doc Name
Responses to Adequacy Review
From
Greg Lewicki and Associates
To
DMG
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-one 1,000 gallon AST diesel fuel tank in the pump location at Pond A to service the generator for <br />the pump. This tank will be placed in a compacted earth berm area with impermeable plastic lining <br />with enough volume to trap the fuel from a full tank with 10% safety factor. <br />- portable asphalt plant with 10,000 gallon AST diesel and 20,000 AST hot mix tanks. These tanks <br />will be placed in a compacted earth berm azea with impermeable plastic lining with enough volume <br />to trap the fuel from a full tank with 10% safety factor. This plant will only be on site temporarily to <br />satisfy local road jobs. It is not expected that this plant will be on site for more than 5-6 weeks per <br />year and many years will not see the plant at all. <br />-portable concrete plant with 10,000 gallon AST diesel tank. This tank will be placed in a com- <br />pacted earth berm area with impermeable plastic lining with enough volume to trap the fuel from a <br />full tank with 10% safety factor. <br />- 15 hp diesel powered water pump with 8" aluminum water line mnn;ng from Pond A to the gravel <br />plant area. <br />The site will use all existing roads to haul the product to its final destination for the final mining de- <br />scribed in this amendment. The main road that enters the permit azea from the north and extends to <br />Sediment Pond 1 was planned as a haul road for the coal permit and per landowner wishes, will re- <br />main after reclamation for the post-mining land use. <br />3. Water Information. Rights and Augmentation <br />Details of the water use on site aze presented in Exhibit G -Water Information. <br />Although the mine will encounter water in the mining operation, no additional water surfaces will be <br />created that have not been on site for decades, therefore, no well permit application with the State <br />Engineer's office will be filed. It is planned that some ponds will be left for the post-mining land <br />use. Water for processing, dust control and materials handling will come from two sources that the <br />Ducommun Trust has on the site: <br />Alma Placer 7/03 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.