Laserfiche WebLink
time. The post-mine map will not show the reclamation of these azeas because a firm commitment <br />cannot be made but it is the intent of the Trust to do the work. <br />No blasting will take place in this operation. Any spills of fuel or other hazazdous material will be <br />reported to the Division as soon as they aze discovered. <br />The following table smmnarizes the acreage for the entire permit azea. <br />Combined Permit Area Description Gravel Operation Gold Operation Total <br /> Acreage Acreage Acreage <br />1. Pre-Law Disturbed Area that will be 40.5 36.5 78.0 <br />re-disturbed and reclaimed if the opera- <br />tions complete the full plans shown in <br />this application <br />2. Pre Law Disturbance That May Be 11.0 0.0 11.0 <br />Reclaimed <br />2. New Disturbed Area 0.0 48.0 48.0 <br />3. Undisturbed Area 6.7 72.4 79.1 <br />4. Worst Case Disturbed Area 28.7 34.1 62.8 <br />Total Permit Area 216.10 <br />2.2. Sediment Control System Gravel Minine <br />The gravel operation will employ one fairly large sediment cleanout pond and two smaller ponds that <br />will handle the slurry dischazge from the processing operations. These ponds are labeled Willits <br />Ponds # I , #2 and #3. These ponds will be cleaned out on an as needed basis. The sediment from the <br />ponds will be dug out with an excavator and will be either placed on regraded areas for reclamation <br />Alma Placer 7/03 26 <br />