My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-04-23_REVISION - M1985029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2004-04-23_REVISION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:32 PM
Creation date
11/21/2007 2:41:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
Revision
Doc Date
4/23/2004
Doc Name
Responses to Adequacy Review
From
Greg Lewicki and Associates
To
DMG
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The annual average tonnage mined and sold from the site aze best predictions since many factors <br />such as the economy, competition, etc. greatly affect the actual sales. <br />The life of the gravel operation will be 15 yeazs. Where the gravel is mined from is not easy to deter- <br />mine since it is very dependent upon the gold operation. If the gold operation is viable over the 12-13 <br />yeazs shown in the plan, a lazge part (60,000 tpy) of the gravel sold from the site will be the waste <br />gravel from the gold plant. If the gold operation is uneconomic, gravel will then be aggressively <br />mined from the gravel mine azea as shown on Map C-2. For planning purposes, it is predicted that <br />the gravel operation will be in place I S yeazs at an average product sales rate of 130,000 tons per <br />yeaz, with 2 possible scenarios: <br />1) The gold mine operates for 12 years and using the same average of 130,000 tons sold per yeaz, <br />60,000 tons per year will come from the waste gravel from the gold plant for 12 yeazs and all tonnage <br />coming from the gravel mine azea for the remaining 3 yeazs. Therefore, the tonnage to be mined from <br />the gravel area is 70,000 tons per yeaz x 12 yeazs + 130,000 tons x 2 years = 1,100,000 tons. The rec- <br />lamation plan map assumes that this case will occur, therefore, it shows a volume removed in the <br />gravel mine azea of 1,100,100 tons. <br />2) The gold mine does not operate for any significant period of time. In this case, the gravel mine <br />will produce all sold material from the gravel mine azea, which is basically 2,000,000 tons over the <br />15 yeaz period. Almost all of the previously mined areas aze reclaimed from gravel mining. <br />In either scenario, front end loaders will be used to deliver the raw gravel to the crushing, screening <br />and wash plants for sepazation into vazious products. Fogger sprays will be present in all three plants <br />to keep dust down. The crusher will also employ sprays. The plants will be located to minimize im- <br />pacts to the town of Alma. <br />The breakdown of the disturbed acreage is given below: <br />Alma Placer 7/03 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.