Laserfiche WebLink
Gold Placer Disturbed Area Description Acreage <br />1. Mining Cut Areas 52.4 <br />2. Berm along Highway 9 2.8 <br />3. Topsoil Stockpiles 2.8 <br />4. Sed Pond Area at South end of Permit Area 4.4 <br />5. Prep Plant azea, processing, stockpile areas l 0.1 <br />6. Overburden Storage Area from Cut 1 3.0 <br />7. Pond A Area 3.60 <br />8. Camp/Office/Fuel Storage Area 3.4 <br />9. Site Roads 2.00 <br /> <br />Total Disturbed Area 84.50 <br />It should be noted that this disturbed area is the total for the mine life. Only 3 cuts of 47 will be dis- <br />turbed at any one time since reclamation will be ongoing, therefore, the total azea disturbed at any <br />one time will be these cuts plus ancillary disturbance totaling only 34.1 acres in the worst case. <br />Roads, ponds and other azeas that will be lefr after reclamation will reduce the final area to be re- <br />claimed. <br />Alma Placer 7/03 21 <br />