07/26/2004 15:04 720BB91383 PAGE 03 <br />• Incorporate test-boring data into a final plan and profile and prepare slttrry wall details. <br />• Prepare technical specifications for construction of the slurry wall and associated <br />facilities. The technical specificarions will incorporate recommendations provided in the <br />"Guide to Specification Preparation for Slurry Walls and Clay Liners as a Component of <br />a Colorado Mined Land Reclamation Permit," prepared by the Division of Minerals and <br />Geology (DMG) of the Colorado Department of Natural Resources. <br />• Prepare a final design report, a design plan set, and technical specifications. Three copies <br />of the final design report and technical specification set will be submitted to Envirocon. <br />• Submit the report to the State Engineer and respond to questions and comments <br />ultimately resulting in design approval letter from the State. <br />Lyman Herat has made the following assumptions: <br />• Design of a toe drain or elaborate slope reinforcement will aot be required. <br />• Permanent reservoir slopes wiU be designed by others. <br />• It is the owners responsibility to obtain all permits <br />SLURRY WALL CON5TRUCTION <br />Upon receiving all approvals necessary to begin construction of the Longhorn Lake Slurry <br />Wall, Envirocon will mobilize to the project site. The equipment spread scheduled for the <br />Longhorn Lake Slurry Wall project is as follows: <br />• Komatsu PC 750 with a depth capability of 35 feet to excavate the slurry wall trench <br />• Komatsu PC 300 to mix the dry slurry and backfill the trench <br />• D-6 LGP Dozer to mix dry slurry and backfill the trench <br />• JetShear Slurry Mixing Unit and six inch pumps <br />• Four inch HDPE slurry distribution pipe <br />• Frac Tank as needed <br />• Telescopic fork lib <br />'fhe fast tasks toward slurry wall construction will include excavating the slurry holding <br />pond, fuse weld the four inch HDPE slurry distribution pipe, set up the office trailer and <br />utilities, trm water line from ittigation wells to the JetShear slurry mixing unit, take delivery <br />of bentonite, survey the slurry wall center line and wnstruct the working platform where <br />needed. <br />Onee the project is set up, bentonite slurry mixing in the holding pond will begin and <br />excavation of Ure slurry wall can commence. Envirocon is currently estimating that the <br />average depth of the gravels in the Longhorn Lake area is 25 feet and a key into bedrock of 3 <br />feet will he adequate. However, the Field investigation portion of this project may alter these <br />assumptions. <br />