My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-10_REVISION - M1988112 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1989-10-10_REVISION - M1988112 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:49:18 AM
Creation date
11/21/2007 2:38:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/10/1989
Doc Name
GENERAL OPERATION INFORMATION
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure C-3. The skid-mounted reclaim pumps will be constructed <br />• at elevations of 8500 ft and 8540 ft in the lower and upper <br />disposal areas, respectively. Initial tailings deposition will <br />be controlled to maintain the free water pool at the upper and <br />lower areas. <br />During Phase II operations, water will be reclaimed to <br />the mill through a single intake operated from a~n access ramp <br />which connects the tailings surface to the 8620 bench as shown <br />on Figure C-4. Tailings deposition will be controlled to <br />maintain the free water pool at the base of the access ramp <br />and as far away from the main embankment as possible. <br />D.6.7.4 Phase I Operations <br />The initial tailings discharge during Phase 1 operations <br />will occur from a single spigotting point located in the <br />northwest corner of the lower disposal area and the northeast <br />corner of the upper disposal area. Following development of <br />• a layer of tailings covering the liner and drainage system, <br />deposition of tailings will continue from the 8,590 bench at <br />the east end of the upper disposal area and from the 8,550 <br />bench on the main embankment. Tailings will be deposited in <br />a manner to maintain the free water pool adjacent to the access <br />ramps in each disposal area. <br />Tailings will be transported from the process area at <br />a rate of 4,680 TPD via an eight-inch diameter HDPE pipeline <br />to the perimeter of the disposal area at an approximate <br />elevation of 8,590. The distribution system will extend around <br />the entire perimeter of the disposal area with individual <br />spigot locations every 100 ft. The distribution system will <br />be constructed using Driscopipe 8600 or equivalent. The <br />pipeline from the milling facilities to the disposal area will <br />be placed in a 10-ft wide trench double lined with a 80-mil <br />HDPE synthetic membrane. <br />• <br />D-56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.