Laserfiche WebLink
~~" <br />7. After backfilling and grading are completed, and topsoil <br />replaced, the approved mulch crop (annual seed mix) will be <br />seeded on the project. Seeding is scheduled during September <br />or October 1995 after the topsoil is replaced. <br />EROSION CONTROL <br />8. Immediately following the seeding operation, contour furrows <br />as designed per the approved permit will be installed along <br />appropriate land slopes of the project. The furrows will then <br />be hand seeded with the annual seed mix to accelerate <br />establishment of vegetation within the furrows. <br />-2- <br />