Laserfiche WebLink
<br />III. Comments - Compliance <br />Below are comments on the inspection. The comments include discussion of <br />observations made during the inspection, comments also describe any <br />enforcement actions taken during the inspection ana the facts or evinence <br />supporting the enforcement action. <br />control contamination of the drain by topsoil, etc. `f he fill drain will <br />be keyed in for its entire length. <br />.as permitted, lifts will be from 50 to 100 feet in height to allow for <br />natural sorting of material resulting in natural drainage. Vo filter <br />fabric will be used permanently on the drain. <br />The mine is documenting all phases of construction (available for <br />inspection). <br />*An engineer must verify the presence of shallow bedrock prior to <br />construction of the underdrain. Should this turn out not to be the case, <br />a report would need to be made to the Division and agreement reached <br />prior to construction of the underdrain. <br />`1 <br />~~' ~ <br />Bonding ~/ ~ "w"^"'~ <br />/FJ~ <br />Operator needs to submit new permit language referring to bond <br />calculations visa vi final bond liabilitc as referred to in Division's <br />Findings Document for PR-O1. <br />1991 pil Saill <br />Colowyo reports that they have been working diligently- to get Texaco Oil <br />to reclaim the site of tiie spill to the necessary standards; particularly <br />as they apply to reclamation ot• the access road, diversion ditch and dam <br />site. the llivision has offered to assist Colowyo, as needed, in this <br />efT'ort. <br />South Grazin, Fence <br />Operator reports contract going out soon to construct fence this Fall. <br />