Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />.._ <br />~+a s.4~.4 ~' ~,..' <br />PROJECT IDENTIFICATION <br />Task # : 04r State :Colorado Permit/job# : M-2001-069 <br />Date <br />User <br />04/09/2002 <br />RCO <br />County :Rio Grande Abbreviation : none <br />Site :Del Norte West Valley Pit Filename : M069-04r <br /> <br />Agency or organization name : DMG <br />Permit or other job action : TR-Ol, Additional <br />Task description :Spread topsoil <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />staging area <br />on new staging area <br />Basic machine :Cat D8R - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank upper <br />Ownership cosUhour <br />Operating cosUhour <br />Ripper op.cosVhour <br />Operator cosUhour <br />Total unit cosUhour <br />volume: 2,791 LCY <br />Utilization °k <br />$49.50 NA <br />$65.98 100 <br />$0.00 0 <br />$27.99 NA <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$143.48 Total fleet cosUhour <br />$143.48 <br />Swell Loose <br />factor: NA volume: 2,791 LCY <br />Source of estimated volume :6.92 ac x 3" depth <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % (I <br />Average site altitude : 7, 840 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv packed <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower: 305 <br />tors Source <br />0.75 (avg.) <br />1.20 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (l shift/day) <br />0.70 (fnd-mf) <br />1.00 (Cat HB) <br />1.00 (Cat HB) <br />0.90 (Cat HB) <br />1.00 (S/SU/U) <br />0.47 <br />660.05 LCY/hr <br />660.05 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 4.23 Hours <br />Unit cost : $0.217 /LCY Total job cost : $607 <br />.. <br />., k.. ~r <br />:: :. <br /> <br />__ .1 : ,.. <br /> ,..~ <br />