My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-04-09_REVISION - M2001069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001069
>
2002-04-09_REVISION - M2001069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:51 PM
Creation date
11/21/2007 2:30:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001069
IBM Index Class Name
Revision
Doc Date
4/9/2002
Doc Name
Revised Financial Warranty Estimate
From
DMG
To
Asphalt Constructors Inc
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER-ONLY WORK <br /> <br />PROJECT IDENTIFICATION <br /> Agency or organization name : DMG <br />Task # : 0?! State :Colorado PermiOjob # : M-2001.069 <br />Date: 04/092002 County:Rb Grande Abbreviation :none <br />User: RGO Site:RM Grande West Valley Pit Filename:M069-03r <br />Permit or other job action : TR-Ol, AddiBOna/ staging area <br />Task description :Haul topsoil from stockpi/e to neW staging area <br /> <br />HOURLY EQUIPMENT COST <br />Model :Cat 623E Shift hasis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 365 <br />Ownership costlhour: 850.47 NA <br />Operating costlhour : 891.56 100 Weight (UST) : 38.92 <br />Operator costlhour : 828.16 NA Cost data source : (CRGJ <br />Total unit costlhour: 8170.22 Total Oeet costlhour : $170.22 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 2,791 LCY factor. NA volume: 2,791 LCY <br />Source of quantity take-o0: 6.92 ac x 3 in depth <br />Source of estimated svvell (actor : NA <br /> <br />HOURLY PRODUCTION <br />Haulino Capacity <br />Material description : Heaped volume : 23.00 LCY <br />Earth-Dry packed Average volume: 20.50 LCY <br />Rated payload : 55,200 pounds <br />Payload capacity : 21.65 LCY Adjusted capacity: 20.60 LCY •^ <br />Cvcle Time(load+haul+spread+returN: Loading time: 0.90 minutes' <br /> Maneuver and spreading time: 0.70 minutes <br />Travel lime : ' loatling time par pair on vush-pull models <br />Route Distance (feel) Grade (%) Roll. res.(%) Total res.(%) (Velocity (fpm) I Travel time (min.) <br />Haul: 750 0.0 5.0 5.0 1,338_ 0,66 minutes" <br />Retum: 750 0.0 5.0 5.0 2,337 ~ 0.54 ( minutes" <br />" Vavel time adjustetl for acceleration and deceleration a[ load and tlump points <br /> Total cycle lime 2.81 minutes <br />Joh Condition Correction Factors <br /> <br />Site altitude (feet) : 7,840 Adiusted Hourly Producfon' <br />Altitude adjustment factor: O.B7 (Cat HB) <br />Joh efficiency factor : 0.83 (1 shlNtlay) Unadjusted unit production : 438.12 LCY/Hour"' <br /> Adjusted unit production : 316.37 LCY/Hour <br />Net job correction factor : 0.72 Adjusted fleet production : 318.37 LCYlFbur <br /> ^• 2 times volume on push-pull metlals <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job time : 8.82 Hours <br />Unit cosh 80.538 /LCY Total job cost: $1,602 <br />1 .„ ~{ <br />
The URL can be used to link to this page
Your browser does not support the video tag.