My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-05-16_REVISION - M1985219
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985219
>
2002-05-16_REVISION - M1985219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:46 PM
Creation date
11/21/2007 2:28:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985219
IBM Index Class Name
Revision
Doc Date
5/16/2002
Doc Name
Amendment Application
From
Parkerson Construction Co.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br />Reclamation Costs <br />Approximately 65,900 cubic yards of earthen material will be required to reclaim <br />the entire pit expansion azea. A maximum of 18.9 acres (Area A) will be disturbed at one <br />time, and will require approximately 50,000 cubic yards of earthwork to reclaim. <br />Mining will occur in two basic phases. In Phase I, Area A (18.9 acres) will be <br />mined. In Phase II, Areas B (4.4 acres) and C (2 acres) will be mined as the S '/Z of Area <br />A is being reclaimed. Areas B and C will be reclaimed when mining is completed. <br />Estimated reclamation costs for Phases I and II are outlined below: <br />PHASEI PHASE II <br />18.9 acs. 6.4 acs. PHASEI PHASE II <br />Volume earthwork 50,000 15,900 ($0.50/cubic yard) $25,000 $ 7,950 <br />(cubic yards) <br />Mulch/Fertilize/Seed ($800/acre) 15,120 5,120 <br />Weed Control ($50/acre) 945 320 <br />$41,065 $13,390 <br />The total estimated cost to reclaim the entire permit expansion azea is $54,455, or <br />approximately $2152/acre ($54,455 / 25.3 acres). <br />
The URL can be used to link to this page
Your browser does not support the video tag.