My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-11_REVISION - M1980022
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980022
>
2002-07-11_REVISION - M1980022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:27 PM
Creation date
11/21/2007 2:28:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980022
IBM Index Class Name
Revision
Doc Date
7/11/2002
Doc Name
TR Approval
From
DMG
To
Oldcastle SW Group Inc. dba United Companies of Mesa County
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MOTOR GRADER WORK - <br />Agency or organization name :DMG <br />Task#: 04a State:Colorado PermiVjab#:M-1980.022 <br />Date: 0 7/1 12 00 2 County:Mesa Abbreviation :none <br />User: SSS Site :Preston Pit Extension Filename: M022-04a <br />Permit or other job action : TR-01 <br />Task description :Rip and grade facilities, stockpile, and backfilled north area <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 16H Horsepower: 275 <br />Attachment no. 1 : NA Shift basis : 1 per day <br />Attachment no. 2 : Muttiahank ripper <br /> Utilization % Cost data source: (CRG) <br />Cost Breaktlown Ownership cosdhour : $56.77 NA <br />Operating cosUhour: $58.90 100 <br />Ripper op.cost/haur: $2.15 50 <br />Operator cosUhour: $27.99 NA <br />Total unit cosi/hour: $145.81 Totalfleet cest/hr: $145.81 <br />MATERIAL QUANTITIE <br />Total area to be graded : 14.86 acres <br />Source o(quandty takevft : TR-Of <br />HOURLY PRODUCTION <br />Selected greding activityAvork level :Metlium grading/npping <br />Unadjusted houry unit production <br />0.79 acres8v (Cat HB) <br />Job Condition Correction Factors <br />Average site altitude: 4,540 feet <br />Altitude adjustment factor: 1.00 (Cat HBJ <br />Job effciency adjustmant factor 0.83 (1 shift/dayJ <br />Net job correction : 0.83 <br />Adjusted houry unit production : 0.66 acres/hr <br />Adjusted hourly fleet production : 0.66 acres/nr <br />JOB TIME AND COST <br />Fleei size : 1 Greder(s) Total job time : 22.66 Hours <br />unit cost: $zzz.37 lane Total job cost: $3,304 <br />
The URL can be used to link to this page
Your browser does not support the video tag.