Laserfiche WebLink
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK - <br />PROJECT IDENTIFICATION <br />Agency or organization name:OMG <br />Task#: 03a <br />Date : 07/112002 <br />User: SSS <br />Task eescdption :Shape 1575' of pit slope below water level <br />HOURLY EQUIPMENT COST <br />Basic machine:Cat 322E (1996) Shift basis: lper day <br />CostBreakdown: Utilization% Horsepower: 153 <br />Ownership cosuhour: $33.01 NA <br />Operefing cesuhour: $36.05 100 Weight (MT): 22.68 <br />Opemtar cosghour: $28.18 NA <br /> Cost data source : (CRG) <br />Total unit cesuhour: $9724 Total fleet wsuhour: 397.24 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 3,750 LCY factor: NA volume: 3.150 LCV <br />Source of quantity take-0ft :Assume 1575'L x 27'lN slopes graded at avg. 2' depth <br />State:COlorado Pennivjob#:M-1980-022 <br />County :Mesa Abbreviation :none <br />Site :Preston Pit Extension Filename : M022-03a <br />Permit or other job action : TR-01 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Cvcle Time Basic digging conditon description: AVERAGE <br />Tme value within basic digging condition : AVERAGE <br />Cycle time: 0.33 min. <br />Bucket Caoacity <br />Rated capacity : 1.57 -LCY (heaped) Size Gass : medium <br />Bucket fill factor : 0.97 Loose material - mixetl moist aggregates (95100%J <br /> <br />Adjusted capacity : 1.53 LCY <br />Job Condition Correction Factors Altitude adjustment: 1.00 ~ (Cat HBJ <br /> Job efficiency adjustment: 0.83 (1 shilNday) <br />Site altitude: 4,540 feet <br /> Net job correction : 0.83 <br />Unadjusted howdy unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size: 1 Excavator(s) <br />278.32 LCY/Hr <br />231.00 LCY/Hr <br />231.00 LCY/Hr <br />Total job time <br />13.64 Hours <br />unit cost: $0.421 /LCY Totaljobcost: $1,326 <br />