Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task#: S1a <br />Date : 04/11/2005 <br />User: SSS <br />State :Colorado Permit/job# : M-1977-205 <br />County :Delta Abbreviation :none <br />Site :Tri-County Gravel Filename :M205-s1a <br />Agency or organization name :DMG <br />Permit or other job action : TR-01 <br />Task description :Regl <br />HOURLY EQUIPMENT COST <br />stream channel and dike in south instream <br />Basic machine :Cat D7R Series /l - 7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership wsUhour : $40.61 NA- <br />Operating cosUhour : $48.13 100 <br />Ripper ap. cosUhour : $0.00 0 <br />Operator cost/hour: $31.76 NA <br />Total unit cost/hour : $120.50 Total fleet cost/hour : $120.50 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,025 LCY factor: NA volume: 1,025 LCY <br />Source of estimated volume :Assume 2000' x 25' banks graded @ .5 ac. k. <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Ory, non-cohesive <br />55 feet <br />989.1 LCY/hr <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Gravel - Pitrun <br />9.00 % (I <br />5,380 feet <br />3.250 Ibs/LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient: <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower: 240 <br />0.75 (avg.) <br />0.80 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshiff/day) <br />0.70 (irid-mf) <br />0.81 (Cat HB) <br />1.00 (Cat HB) <br />0.71 (Cat HB) <br />1.00 (S/SU/U) <br />0.20 <br />197.70 <br />197.70 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 5.18 Hours <br />Unit cost : $0.610 /LCY Total job cost : $625 <br />