Laserfiche WebLink
~1 <br />1 <br />' ACTION <br />Grading oP disturbance #1. <br />Topsolling and seeding #1 & #4. <br />Submittal of sediment pond design <br />' Installation oP culverts <br />IMPLEMENTATION DATE <br />DEC 1989 <br />DEC/JAN 1989/1990 <br />JAN 1990 <br />FEB 1990 <br />' Construction of sediment pond MAR 1990 <br />Planting oP trees APR 1990 <br />' OVERALL COMPLETION DATE: April 30, 1~ ~ Q q Q <br />(Date does not necessarily include tree /Y~nq rj <br />planting) OOH„~ /r' <br />Tree planting will occur within 7 days of the date trees are available. <br />The date the trees are available is largely controlled by the late <br />winter and early spring weather. If it is unusually cold, availability <br />' can be delayed into early May. Typically, the trees are available by <br />the middle of April. <br />^ The Operator will proceed immediately upon approval with all aspects of <br />' the corrective action that can be accomplished without weather delays. Any <br />Modification to this schedule may be necessary and will be reported to the <br />MLRD. <br />--------------------------------------------------------- <br />~ The Appendix information, Geotechnlcal Report, and Exhibits follow and <br />' are considered a part oP this CAP. All recommendations are subject to the <br />conditions set forth herein. The hydrologic analysis of this CAP has been <br />prepared under the supervlslon'of and reviewed by Roland G. Obering, P. :'. & <br />' L.S. 13226. G. O <br />OQ'. P~G~ST EgFD ,'9i <br />' 2 <br />~ ' 13226 ` ~~ . <br />~FOF Cdr-L~~ <br />1 <br />23 <br /> <br />