My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE35003
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE35003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:43 PM
Creation date
11/21/2007 2:26:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Enforcement
Doc Date
10/6/1989
Doc Name
CORRECTIVE ACTION PLAN CAP FOR SNYDER QUARRY ACCESS ROAD PN M-77-210
Violation No.
MV1989015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />1 <br />1 <br /> <br />1 <br />1 <br /> <br />Action Plan for the Snyder Quarry Access Road, October, 1989, <br />Obeying, Wurth & Associates and containing 0.70 acres more or less. <br />BB=4: That portion of the Southeast quarter of the Southeast quartf~r of <br />Section 32 and the Northeast quarter of the Northeast quartc~r of <br />Section 5, Township 13 South, Range 67 West of the 6th P.M. in E1 <br />Paso County, Colorado as shown on Sheet 2 of 2 of the Corrective <br />Action Plan for the Snyder Quarry Access Road, October, 1989, <br />Obeying, Wurth & Associates and containing 0.59 acres more or .less. <br />BB=5: That portion of the Northwest quarter oP the Northwest quarter of <br />Section 4, Township 13 South, Range 67 West of the 6th P.M. in E1 <br />Paso County, Colorado as shown on Sheet 2 of 2 of the Corrective <br />Action Plan for the Snyder Quarry Access Road, October, 1989, <br />Obeying, Wurth & Associates and containing 0.25 acres more or less. <br />The Corrective Actions presented in this section represent the Operator's <br />response to the previously referenced Notice of Violation M-89-015. It is the <br />Operator's Intent to implement the actions upon approval of the regulatory <br />authorities in accordance with the schedule proposed in the following Section <br />and with the assistance and observation of the referenced Consultants and the <br />MLRD staff. <br />S C H E D U L E <br />The following is a schedule for the implementation of the Corrective <br />Actions contained in this CAP. It Is the Operator's intent to comply with <br />this schedule pending adverse weather conditions and revegetation material <br />availability. <br />' ACTION <br />1 <br /> <br />1 <br /> <br />J <br />Correction of small roadside <br />disturbances (a's 5, 6, 7, <br />and old scale site). Includes <br />removal, backfilling, or <br />grading, topsoiling, seeding. <br />Removal of disturbance AF4. <br />Topsolling and seeding of <br />disturbances #'s 2 and 3. <br />IMPLEMENTATION DATE <br />OCT 1989 <br />NOV 1989 <br />NOV 1989 <br />fCOUtluueA...) <br />2z <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.