Cyprus Twentymile Coal Mine ~~/e~N <br />Pond "E^ ~Xiyl~ / <br />Principal Spillway "As-built^ Evaluation ~'~ ~~, <br />,~ /~,~=~rG•l/S <br />The objective of this study was to determine if Pond E ma'urtains the nece: <br />time of 24 hours for runoff from the 10-year, 24•hour design storm event 1..4vwmg the installation <br />of the principal spillway decant orifices. <br />Epp & Associated performed a pond survey of Pond E, dated 11/01/95, which was used to develop <br />the atagelstorage curve that TerraMatrix used in November 1995 for the initial design evaluation. <br />The initial pond evaluation, titled, "As-built"Design Eunluotion and Emergency Spillway Design ", <br />was dated 11/15195, and utilized the SEDCAD' (SEDCAD) Hydrologic Model (Schwab, 1992). <br />SEDCAD was also used in this evaluation. <br />Cyprus Yampa Coal Company (CYCC) modified Pond E subsequent to the November 1995 <br />evaluation and TuraMatrix rawaluated the storage capacity and spillway specifications to determine <br />if sufficient storage capacity and detention time were maintained for tvnoff from the 10-year, 24-hour <br />storm event. CYCC provided the cutrratt stagdstorage curve and construction specifications for both <br />the principal and emugency spillways. The stage/storage curve is provided as an attachment to this <br />evaluation. The principal spipway Corrsituction specifications included the number of decant orifices, <br />the orifice dimensions, and elevations. The principal spillway decant orifices were constructed to the <br />following specifications and dimensions: <br />• Two 3 inch by 3.5 oblong orifices at 6,840.6 feet above mean sea level (MSi.) <br />• Four Z.S inch diameter orifices at 6,841.4 feet above MSL <br />Tlic emergency spillway was constructed with a 17 foot bottom width, sideslopes of 1H:1.SV and <br />1H:S.SV for the right and left sideslopea, respectively, and a 55 foot bottottT length. <br />The Novembu ]99.5 SEDCAD evaluation was used as the basis for the Principal Spillway "As-built" <br />Evaluation. Subwatershed areas, the dcaign storm precipitation amount, routing parameters, and <br />sedimemology model inputs remained the same from the Novembu design evaluation. Input changes <br />included the stage/storage curve and the spillway specifications. <br />Due to model input limitations, three decant orifice scenarios were evaluated. SEDCAD flocs not <br />allow the user to input an unequal number of orificca at diffuetrt elevations, conscqucntly, it should <br />be noted that the exact number of orifices could not bo evaluated, Additionally, SEDCAD assumes <br />that an orifice is circular. A sensitivity analysis was conducted to determine a minimum, a maximum, <br />and the calculated ninoff retention times for the design storm. <br />The minimum retention lima was determined by inputting four orifices per elevation versus the "as- <br />buih" which specified two orifices at 6,840:6 feet above MSL and four at 6,841.4 feet above MST.. <br />In addition, the orifices at 6,840.4 feet were input as a 3.5 inch diameter opening, which is a slightly <br />Fikc VUOik~i`~_a~pincipJ.dJ~7Ii9/% <br />