Laserfiche WebLink
Sheet 1 of 3 <br />Colorado Divi Sian of Minerals atd Geology <br />ESTIMATING FORM - TRUCK/LOADER TEAMS <br />____________________________________ <br />____________________________________ <br />Task No. 1 Prep. By: CLK Permit No. N-93-041 <br />Date 08/16/95 Filename: M041-1 Operation: Dove Flats quarry <br />Permit Action TR-01 <br />Task Description Backfill pits with waste rock ~ - <br />XOURLY EOUI PNENT COSTS: <br />____________ _________ Single, Double or Triple <br />County: BOULDER Labor Zone 1 Shifts S <br />Equipment Descriptions <br />Truck/load teem - Truck CAT 7738 SOt, 34.0 to 44.6 cy, off-highway only <br />- Loader CAT 9888 <br />Support equip. -Load area: N/A <br />- Dump area: N/A <br />Road meint. - Grader CAT 140G with RODS cab <br />- Mater T. 2,500 geL . on or off highway <br />Truck/Load Teem - Support Equipment Road Mai ntenance <br />Truck Loader Loed area Dump area Grader Mater T. <br />Equipment Fi leneme: 773BHLTK <br />` 988BLODR N/A M/A 140G•ROP 2-SK4ATK <br />Utilization on job <br />-Machine: 84X 100X N/A M/A 15X 15X <br />-Ripper N/A N/A N/A N/A N/A N/A <br />Cost Breakdown <br />OwnershipNcost/hr: (59.87 (45.48 N/A N/A (16.84 56.88 <br />Operating cost/hr: (51.19 f48.2Z N/A N/A f2.85 f1.13 <br />Ripper Op. cost/hr: f0.00 50.00 N/A N/A 50.00 50.00 <br />Operator cost/hr: (22.82 522.22 N/A N/A 523.13 521.41 <br />Unit subtotals f133.88 5115.92 N/A N/A 542.82 (29.43 <br />tl of eqp. units 6 3 0 0 1 1 <br />Group subtotals- T/L team : 51,151.04 Support: 50.00 Rd. Maint.: 572.25 <br />Total Work Team Cost/Nr ; 51,223.29 L <br />MATERIAL OUANTI TI ES: <br />___________________ <br />___________________ <br />Beg. <br />Volume: 400,000 CCY <br />Cu.Yd. -------^-- Swell Loose <br />Vol une: 400,000 CCY Factor: 1.320 Vol unie: 528,000 LCY <br />Source of quantity takeoff: p. 1, TR-001 <br />_____________________________________________ <br />Source of est. swell factor: N/A <br />