Laserfiche WebLink
<br />RECLAMATION COST SUMMARY con['d sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.l <br />________+__,._______ <br />_______ Task <br />_____ Description <br />___,.~________~______ I Cost (f) <br />______I~_~_______ <br />Subtotal (K): <br />_______ <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Task No.~ Task Description ~ Cost (f) <br />________I__________________________~___w_~______r_~____I____________ <br />Subtotal (U; <br />N. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ task Descri pion ~ Lost (S) <br />________I__..__~_______________r__._______________________I___________ <br />6 ~ Revegeteti~n I 5680,530 <br />Demolition <br />Seeding <br />8 ~ iriw}~imaintenance end mowing for weeds ~ f2, 375 <br />9 ~ Mob/Demob I f9,482 <br />Subtotal (M ); (692,387 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M); 57,890,333 <br />11. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description <br />Cost (f) <br />1. ~ Public Liability Insurance.... <br />2. ~ Contractor's Performance Bond <br />3. ~ Lontrec ton's Profit........... <br />4. ~ Job Superintendent.. <br />7.550% of dir. ~ (29,300 <br />0.975% of dir. I (18,431 <br />)D.OOX of dir. ~ f)89, 033 <br />Subtotal (A ): 5236,764 <br />TOTAL CONSTRUCTION CONTRACT AMWNT (direct plus 0 8 P); 52,127,097 <br />B. DNG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description ~ Los[ (f) <br />1. ~ Minerals Program Adm 5.00% of cntr.~ (106, 355 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): f106,355 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 5343,119 <br />TOTAL PERFORMANCE BOND AMOl1NT (direct plus indirect costs): 52,233,452 <br />