My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-08-31_REVISION - M1993041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993041
>
1995-08-31_REVISION - M1993041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 5:39:53 PM
Creation date
11/21/2007 2:25:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993041
IBM Index Class Name
Revision
Doc Date
8/31/1995
Doc Name
RECLAMATION COST SUMMARY FORM
From
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ROADABLE EOUI PMENT: <br />___~_~__~_~__., Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description <br />__ Cost/hr (no. hauled) Cost/hr Cost/hr <br />_ <br />____________________________ <br />Hater truck ________________________ _ <br />(40.00 a______-________________________ <br />7 f40.00 _____________ <br />(40,00 <br />MOB/DEMOB SOPPORT EDUIPMEN7: <br />Subtote is (40.00 <br />--------------------------- Yeight Ownership Haul Rig Flee[ Size Haul Trip <br />Non-ROadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr <br />f40.00 <br />sheet 2 of 2 <br />Return Trip DOT Permit <br />Cost/hr Cost/ea <br />S~totals 50.00 f0.00 50.00 <br />Total Eqp. Fleet Size Heul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />_______________________________________________________________________________________________________ <br />_______________________________________________________________________________________________________ <br />Subtotals : <br />EIXII PMENT HAUL DISTANCE $ TIME <br />Nearest major city or town within project area region: Lyons <br />Total one way travel distance = 30.0 miles. Average travel speed = <br />Job Time - Non Roadable Equip.= 0.00 hours load Roadable Equip-= <br />1.00 hours haul <br />0.00 hours unload <br />1.00 hours return <br />J08 COST <br />Total Mob/Demob Lost = 59,482.18 <br />50.00 f0.00 <br />30.00 mph. A~ <br />N/A hours load <br />1.00 hours haul <br />N/A hours unload <br />1.00 hours return <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each Loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times azut be increased substantially for equipment which must be <br />partially dismantled for transport and reassembled at the job site. Costs for lifting equi Anent and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.