Laserfiche WebLink
<br />ROADABLE EOUI PMENT: <br />___~_~__~_~__., Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description <br />__ Cost/hr (no. hauled) Cost/hr Cost/hr <br />_ <br />____________________________ <br />Hater truck ________________________ _ <br />(40.00 a______-________________________ <br />7 f40.00 _____________ <br />(40,00 <br />MOB/DEMOB SOPPORT EDUIPMEN7: <br />Subtote is (40.00 <br />--------------------------- Yeight Ownership Haul Rig Flee[ Size Haul Trip <br />Non-ROadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr <br />f40.00 <br />sheet 2 of 2 <br />Return Trip DOT Permit <br />Cost/hr Cost/ea <br />S~totals 50.00 f0.00 50.00 <br />Total Eqp. Fleet Size Heul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />_______________________________________________________________________________________________________ <br />_______________________________________________________________________________________________________ <br />Subtotals : <br />EIXII PMENT HAUL DISTANCE $ TIME <br />Nearest major city or town within project area region: Lyons <br />Total one way travel distance = 30.0 miles. Average travel speed = <br />Job Time - Non Roadable Equip.= 0.00 hours load Roadable Equip-= <br />1.00 hours haul <br />0.00 hours unload <br />1.00 hours return <br />J08 COST <br />Total Mob/Demob Lost = 59,482.18 <br />50.00 f0.00 <br />30.00 mph. A~ <br />N/A hours load <br />1.00 hours haul <br />N/A hours unload <br />1.00 hours return <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each Loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times azut be increased substantially for equipment which must be <br />partially dismantled for transport and reassembled at the job site. Costs for lifting equi Anent and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />