Laserfiche WebLink
<br />Colorado Division of Minerals end Geology sheet 1 of 2 ' <br />ESTIMATING FORM - EDUIPMEMT MOBILIZATION / DEMOBILIZATION <br />Task N... 9 Prep. by [LK Filename..M041-9 <br />_-_-----9_-- ____~___ ____-__~~ y <br />Date..... 31-Au 95 Permit N M-93-041 Mine......DOwe Flats guarr <br />Permit Action........ 7R0001 <br />Task Description..... Mob/Demob <br />XOURLY EDUIPMENT COST <br />_____________________ NOTE - This is a list to select from, not a list of merxlatory itens to include. <br />Mob/Demob Ems. -Tractor 6x4, 75,000 lb GW, 375 HP, diesel powered <br />-Lt. Trailer 25 ton folding gooseneck, drop deck <br />-Ned. Trailer 50 ton folding gooseneck, drop deck <br />-NVy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />-Hyd. Crane : Grove RT58D rough terrain hydraulic crane, 20 tan capacity, 125 hp, 60 ft, boom <br />-Fuel Truck : 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20,000 lb GW, 175 HP, diesel powered <br />Lest Update: ____~______________~_--______________~_________________~__ ____________ ~_ <br />N <br />Decenber, 1994 <br />--------- L[. Rig Med.Rig Nvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Lost Breakdown: <=25 T. 26-50 T, > 50 T. Cer Crane Truck Truck Truck <br />Ownership Cost/hr - 527.88 531.23 538.36 f1.81 (19.89 (6.95 f12.79 55.71 <br />Operating Cost/hr = 526.84 529.29 534.27 55.12 523.40 f18.53 f24.52 f8.00 <br />Operator Cost/hr = (21.40 (22.03 f22.03 (21.24 520.86 t21.24 521.24 (21.24 <br />Helper Cost/hr = 520.60 f21.24 f21.24 f0.00 f0.00 (0.00 (0.00 (0.00 <br />Total = 596.72 5103.79 f115.90 528.17 (64.15 (46.72 558.55 534.95 <br />NON-ROADABLE EQUIPMENT: <br />---------------------- Weight Ownership Haul Rig Fleet Size Naul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Cost/hr (ra. hauled) Cost/hr Cost/hr Cost/ea <br />______________________________ <br />CRT 9N __________ <br />40.10 ___________ <br />(48.70 ____________ <br />5103.79 ______________ <br />2 _____________ <br />(304.98 _______________ <br />(207.58 ___________ <br />f150.00 <br />Cat 637E Scraper w/Push-Pull 56.04 572.25 f115.90 Z (376.30 (231.80 (0.00 <br />Cat773B 50.00 5133.88 f103.79 6 (1,426.02 (622.74 f0.00 <br />CAt 9888 17.00 5115.92 596.72 3 f637.92 (290.16 f0.00 <br />Cat 140G with BOPS cab 20.00 536.71 596.72 1 5133.43 596.72 50.00 <br />Revegetation equipment 15.00 (30.00 (96.72 1 (126.72 596.72 50.00 <br />____________________________________________________________________________________________________________________ <br />____________________________________________________________________________________________________________________ <br />Subtotals (3,005.37 (1,545.72 f150.00 <br />