Laserfiche WebLink
<br /> <br />Technical Revision TR-09 Apuroval 2 Aaril 21.2000 <br />5~ j <br />Stipulation No. Description <br />grout, include a description of any problems that occurred and their resolution, <br />and will include compressive strength test results from the cured grout samples. <br />4 The penetration of No. 3-Dam by the abandoned No. 2-Dam decant system could <br />create a pathway for seepage and piping which are potential dam stability issues. <br />Within 60 days of date of technical revision TR-09 approval, Henderson must <br />provide the Division with a report on this potential, which may comprise records <br />on the construction of No. 3-Dam as they relate to the decant system <br />penetrations, or if adequate historical records are unavailable Henderson must <br />provide the Division with a proposal to investigate the nature and condition of <br />the decant system penetrations. <br />If you have any questions, please contact me. <br />Sincerely, <br />Allen C. Sorenson <br />Reclamation Specialist <br />c:\windows\personal\henderson tr-9.doc <br />