Laserfiche WebLink
• <br />-- <br />PIVI~IgN qF MINRRAtfi ANP GEOLOGY <br />Dep~flRlefll of Nat4rd~ Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FA%:(303)832-8106 <br />April 21, 2000 <br />Mr. Erich Bower <br />Climax Molybdenum Company <br />19302 County Road #3 <br />Parshall, CO 80468 <br />~~ <br />STATE OF COLORADO <br />~~~I ~~ <br />RE: 2-Dam Decant Grouting and 3-Dam Seep Water Management, Henderson Mill, <br />Technical Revision TR-09, Permit No. M-77-342 <br />Dear Mr. Bower: <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />gil I Owens <br />Governor <br />Greg E. Watcher <br />E~eculrve Direuor <br />Michael g. Long <br />Division Director <br />On April 21, 2000 the Division of Minerals and Geology issued a conditional approval of the technical <br />revision application submitted to the Division on April 12, 2000 addressing the following: <br />Grouting a portion of the abandoned No. 2-Dam decant system and the installation of parallel <br />gravity lines to route No. 3-Dam seepage to the No. 1-Dam seepwater collection system. <br />The tetras of the technical revision TR-09 approved by the Division aze hereby incorporated into Permit <br />No. M-77-342. The conditions of the Division approval are listed below. Please note that all other <br />provisions of Permit No. M-77-342 remain in full force and effect. <br />!. . <br />Stipulation No. Description <br />The 3-Dam seepage pipelines will no[ be put into service until the Division has <br />issued written acceptance of the certification of the facility as required under <br />Rule 7.3.2(2) of the Hazd Rock/Metal Mining Rules and Regulations. The <br />certification shall be accompanied by a construction report that will detail the <br />installation of the pipelines, including pipe and valve specifications, adescription <br />of the inlet structures, seepage barriers and south dike reconstruction, a <br />description of any problems that occurzed and their resolution, and a description <br />and test results of pipeline integrity testing. <br />The 3-Dam seepage pipelines will be tested for integrity at least once per year <br />and a description of the testing and results will be provided in the annual <br />reclamation report for the Henderson Mine and Mill <br />Within 60 days of completion, a grouting report will be provided for the 2-Dam <br />decant system grouting operation. The report will detail the installation of the <br />