Laserfiche WebLink
<br />~~ <br />-2- <br />NOTICE OF YIOLATION <br />Based upon these same Findings of Fact and in accordance with <br />C.R.S. 34-32-124, the Colorado Mined Land Reclamation Board hereby finds <br />Castle Concrete Company to be in violation of Permit M-77-210. <br />MODIFIED BOARD ORDER <br />AND CONDITIONAL CEASE AND DESIST ORDER <br />Based upon these same Findings of Fact and Notice of Violation, and in <br />accordance with C.R.S. 34-32-124(2) and (6), the Colorado Mined Land <br />Reclamation Board hereby modifies the Board Order of January 16, 1990 to <br />include the following: <br />All items in the original Board Order must be complied with by <br />October 10, 1990, except for revegetation and planting of trees. This <br />includes, among other items, the installation of the HR-6 culvert, the <br />construction of the sedimentation facility, the installation of a silt <br />fence below the Area 1 slide, and the grading of the Area 2, Area 3, and <br />Area 4 slides. If these items are not completed by October 10, 1990, <br />the operator must cease and desist all mining operations until the items <br />are completed. <br />2. Reseeding of the Corrective Action disturbances must be accomplished by <br />November 1, 1990. If this is not completed by November 1, 1990, the <br />operator must cease and desist all mining operations until it is <br />completed. <br />3. Trees must be replanted on the Corrective Action disturbances by May 1, <br />1991. If this item is not completed by May 1, 1991, the operator must <br />cease and desist all mining operations until it is completed. <br />ORDER TO PAY CIVIL PENALTIES <br />Based upon these same Findings of Fact and Notice of Violation, and in <br />accordance with C.R.S. 34-32-124(7) and the previously suspended Board <br />penalty, Castle Concrete Company is hereby ordered to pay the Colorado Mined <br />Land Reclamation Board a civil penalty in the amount of 32,150 within 30 days <br />of the signature date of this document. <br />