Laserfiche WebLink
Reclamation Table (continued) <br /> Unit Cost Cost <br />As ect Reclamation O eration uanti Units $ $ <br />Minin Cell o <br />D. Stripped overburden and topsoil in <br /> antici anon o minin <br /> 1. Re lace overburden, 6" x 10 acres 8,066 CY 0.85 6,856 <br /> 2. Re lace to soil, 6" x ] 0 acres 8,066 CY 0.85 6,856 <br /> 3. Seed and mulch 10 Ac 675 6,750 <br /> 4. Reseed 20% 2 Ac 675 1,350 <br />E. Area being bacl~Iled, graded, and <br /> seeded <br /> 1. Backfill pit and create 800 ft of 320,000 CY 0.85 272,000 <br /> 3H: ] V slope for groundwater <br /> lake, 10 acres x 20 ft <br /> 2. Replace topsoil, 8,100 CY 0.85 6,885 <br /> 10 acres x 6" <br /> 3. Seed and mulch 10 Ac 675 6,750 <br /> 4. Reseed 20% 2 Ac 675 1,350 <br />Minin Cell s <br />F. No disturbance <br /> <br />General As ects <br />G. Roads and Conveyors <br /> 1. Scarify compacted ground 1.0 Ac 25 25 <br /> 2. Replace topsoil, 6" x 1.0 acres 800 CY 0.85 680 <br /> 3. Seed and mulch 1.0 Ac 675 675 <br /> 4. Reseed 20% 0.2 Ac 675 135 <br />H. Plant Site, Office, and Scale House <br /> 1. Scarify compacted ground 18 Ac 25 450 <br /> 2. Replace topsoil, 6" x 18 acres 14,520 CY 0.85 12,342 <br /> 3. Seed and mulch 18 Ac 675 12,150 <br /> 4. Reseed 20% 3.6 Ac 675 2,430 <br />Total Disturbance Costs 573,941 <br />Contractor Mobilization/Demobilization (8%) 0.08 45,915 <br />Overhead (18.5%) 0.185 106,179 <br />Administration 5% 0.05 28,697 <br />Total Pro osed Financial Warran 754,732 <br />Disturbed Acreage 84 <br />Financial Warran er Acre 8,985 <br />