Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : Opa <br />Date : 06/14/2006 <br />User : SSS <br />State :Colorado PermiUjob# : M-2001-088 <br />County :Mesa Abbreviation :none <br />Site :Up/andGravel Filename: M088-02a <br />Agency or organization name : DMG <br />Permit or other job action :Conversion No. 1 <br />Task description :Grade 8 acre affected area at an <br />HOURLY EQUIPMENT COST <br />2 foot depti- <br />Basic machine :Cat D8R Series ll - 8SU Horsepower : 3>0 <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Utilization <br />Cost Breakdown : Ownership cosVhour : $53.92 NA <br />Operating cosUhour: $75.29 100 <br />Ripper op, cosUhour : $1.60 20 <br />Operator cosUhour: $32.53 NA <br />Total unit cosUhour : $163.34 Total fleet cosUhour : $163.34 <br />MATERIAL QUANTITIES ~~~~ ~~~~-~- ~~~ "~ ~~- ~~ •° - <br />Initial Swell <br />Loose <br />volume : 25,813 LCY factor : NA volume : 25,813 LCY <br />Source of estimated volume : CN-01 mining/reclamation time Tables <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 4,800 feet <br />Material weighs : 2,800 Ibs/LCY <br />Weight description <br />Clay -Natural bed <br />_.. _._ . <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.296 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.82 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />Ha) <br />HB) <br />HB) <br />Adjusted unit production : 551.02 LCY/hr <br />Adjusted fleet production : 551.02 LCY/hr <br />Total job time : 46.85 Hours <br />Total job cost: $7,652 <br />