My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-14_REVISION - M2001088
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001088
>
2006-06-14_REVISION - M2001088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:05 PM
Creation date
11/21/2007 2:21:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001088
IBM Index Class Name
Revision
Doc Date
6/14/2006
Doc Name
Conversion No. 1 Bond Calculation
From
DMG
To
File
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Agency or organization name : DMG <br />Permit or other job action :Conversion No. 1 <br />Task description : BaCkfill pIt fiOOr and <br />HOURLY EQUIPMENT COST <br />after <br />Basic machine :Cat D8R Series 11 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $53.92 NA <br /> Operating cosUhour: $75.29 100 <br /> Ripper op.cosUhour: $1.60 20 <br /> Operator cosUhour: $32.53 NA <br /> Total unit cosUhour : $163.34 Total fleet cosUhour : $163.34 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 43,000 CCY factor : 1.110 volume : 47,730 LCY <br />Source of estimated volume :CN-01 maps and cross-sections <br />Source of estimated swell factor :CArHandbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 634.3 LCY/hr <br />Material consistency description <br />Partly consolidated stockoile <br />Average push gradient : 20.00 % (~ <br />Average site altitude : 4,800 teef <br />Material weight : 2,800 Ibs/LCY <br />Weight description <br />Clay -Natural bed <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Jab efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.43 <br />Altitude : 1.00 <br />Material weight : 0.82 <br />Blade type : 1.00 <br />Net correction : 0.64 <br />Adjusted unit production : 406.93 <br />Adjusted fleet production : 406.93 <br />(Cat HB) <br />(S/SU/U) <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 117.29 Hours <br />Unit cost : $0.401 /LCY Total job cost : $19,159 <br />Unit 5 <br />8SU Horsepower <br />310 <br />Task # : O1a State :Colorado Permit/job# :M-2001-088 <br />Date : 06/14/2006 County :Mesa Abbreviation :none <br />User ; SSS Site :Upland Gravel Filename : M088-01a <br />
The URL can be used to link to this page
Your browser does not support the video tag.