Ms. Erica Crosby <br />Division ofReclamarion, Mining and Satery <br />June 19, 2007 <br />The pipe was installed using standazd practice and procedure methods. The equipment <br />used to install the pipe consisted of a track hoe, 2 CAT 930G front end loaders, and a 335 <br />CAT compactor and a crew of 9 men. A qualified field engineer performed construction <br />observation during construction to assure quality and intent of the design were followed. <br />Construction photographs are attached, <br />If you have any questions or require additional information, please call Taza Schutter or Kallie <br />Bauer at (303) 452-6611. I will be out of the office until July 9`~. <br />Sincerely, <br />Applegate Group, me. <br />Jennifer Lee <br />Project Engineer <br />JJL/ta <br />Enclosures <br />ce: Ben Connell, Connell Resources <br />AG File #02-191 <br />