My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE34720
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE34720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:32 PM
Creation date
11/21/2007 2:19:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
7/22/1992
Doc Name
BOARD MEETING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Battle Flountain Gold <br />6/25/92 Additional Corrective Action Crder <br />Status of Tailings Pond Detoxification Process <br />(Permit No: M-88-I12) <br />Updated as of July 20, 1992 <br />In consideration of Battle Mountain Resources' progress in satisfyi g <br />abatement requirement (4) imposed upon the Notice of Violation issu d to <br />Battle Mountain Gold (BMG) on March 31, 1992, the Mined Land Reclam tion Board <br />imposed the following additional corrective actions on June 25, 199 as <br />allowed in Paragraph 18 of the May 2$, 1992 Board Order. <br />(1) Reduce the tailings pond WAD cyanide level to 50 ppm by July 3 1992, <br />On July 3, 1992 the WAD cyanide level in the lower pond was 31 0 ppm <br />(Core Laboratories). On July 7, 1992 the WAD cyanide level in~the upper <br />pond was reported as 39.6 ppm (Degussa). <br />(2) Maintain the WRD cyanide level below 50 ppm after July 3, 1992., <br />Extensive monitoring da_a was collected on the active lower tailings <br />pond. This data (see attached) documents the steady decrease in the WQAD <br />cyanide level from 31 ppm on July 3, 1992 to 12 ppm as of July 9, 1992. <br />WAD cyanide levels have remained below 15 ppm since July 9th. <br />Limited monitoring data reported the inactive upper tailings o nd to <br />contain WAD cyanide concentrations of approximately 40 on July 7, 1992. <br />On July 16, 1992 BMRI commenced hydrogen peroxide treatment of the upper <br />pond. On July 20, 1992 BMRI reported a WAD cyanide level deter ination <br />cf less than 10 ppm for the upper tailings pond. <br />(3) Impl?ment the additic~al ground i~,Iatef moritori~g proposed in iR~008, <br />BMRI required verbal approval for the two required additional g ound <br />water monitoring ~aells from the Division of Water Resources. I~i <br />acCOrdanc2 with paragraph (3) of the June 25th Order, BMRI mustidrill, <br />complete, test, log and sample the wells; and prepare and submit an <br />evaluative report determining whether additional monitoring wells are <br />required by August 6, 1992. Further, if additional wells are required, <br />install them within thirty days after the Division requires ins allation. <br />(4) Use all reasonably practical steps to co~ti~ue to lower the cyanide <br />levels in the pond to the lowest reasonably achizvable levels. <br />In the opinion of the Division, BMRI has diligently pursued the reduction <br />of cyanide levels in the tailings pond at the San Luis mine sit, as <br />evidenced by the July 20, 1992 reported 4lAD cyanide levels of l~ss than <br />15 ppm in the active lower tailings pond and less than 10 ppm i the <br />inactive upper tailings pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.