My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE34720
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE34720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:32 PM
Creation date
11/21/2007 2:19:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
7/22/1992
Doc Name
BOARD MEETING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />battle Mountain Gold <br />NOV Abatement Requirements & Status <br />page 2 <br />(5) Leak Detection System Effluent Containment. <br /> <br />Status: BMG submitted a written commitment to comply in a let er of <br />April 16, 1992. BMG committed to repair the primary liner if <br />if a leak is detected. No leak has been detected in he <br />secondary clay liner. <br />(6) Cyanide Detection, Interception, Containment and Remedial Treat~ent: <br />Status: BMG submitted a written commitment to comply in a letter of <br />April 16, 1992. BMG committed to development of remedial plan. <br />July Progress: - Bruce Lytle of Hatepaska & Assocs requestep and <br />received verbal approval for two monitorinFC6 well <br />permits from the Division of Water Resourc s on <br />July 7, 1992 ~CI•IP rile /iMH 19358). <br />- In accordance with the Board's additional korrective <br />action Order of June 25, 1992, BMRI must nstall, <br />complete, hydrologically test, geophysical y log, and <br />sample the wells", and "evaluate the data nd submit <br />a report presenting BMRI'S conclusion rega ding the <br />necessity of additional ground water monit,ring <br />modifications", by August 6, 1992. <br />(1) Modification of Or? Processing ~MFthodology: <br />Status: BMG submitted a written commitment to compl•~ in a Lett r of <br />April 16, 1992. BMG committed to the completion of th <br />requested investigations, the development of an approp iate <br />detoxification procedure, and the submission of a summ ry report. <br />(8) Modification of Taiii~gs area Reclamation Plan: <br />Status: BMG submitted a written commitment to comply in a lett r of <br />April 16, 1992. BMG committed to the completion of th <br />requested investigations, the submittal of a comprehen ive <br />report, and the submission of appropriate permit modif cations, <br />if necessitated. The Division originally Specified 5u mittal <br />within 90 days following detoxification, however, BMG as <br />demonstrated that 180 days will be required to complet the <br />requested evaluation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.