Laserfiche WebLink
drainage. <br />3. Will the proposed regrading affect the backfill and grading of the present B Pit <br />location or the post-mine drainage configuration? <br />4. The revision should include a revised schedule with completion dates for backfilling <br />and grading,topsoiling and seeding. <br />In summary, the proposed design appears to approximate the original drainages more <br />consistently than the existing configuration. Please consider the above concerns in the <br />formal submittal of the technical revision. This revision should be submitted to the Division <br />as soon as possible. <br />If you have any questions, please do not hesitate to call. <br />Sincerely, <br />'~- <br />r~~S~~ <br />Erica S. Crosby <br />Environmental Protection Specialist <br />c: \wp51 \seneca\960124 <br />