My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-08-24_REVISION - M1982015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2006-08-24_REVISION - M1982015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:44 PM
Creation date
11/21/2007 2:18:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Revision
Doc Date
8/24/2006
Doc Name
Remaining Adequacy Review Comments
From
DRMS tas
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />7313 Sherman S[., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />Date: August 24, 2006 <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />- &- <br />SAFETY <br />Bill Owens <br />Governor <br />Russell George <br />To: Deb Gonima, Carl MOUd Executive Director <br />Ronald W. Ca"any <br />From: Tom Schreiner ~ Division Director <br />Natural Resource Trustee <br />RE: "Remaining Adequacy Review Comments", Siegrist Pits/Del Camino Properties <br />Permit No. M-1982-015, Class: Revision Type-Seq.: AM-1 <br />Listed below are remaining adequacy review comments on the above amendment application, <br />that will need to be resolved prior to Division approval. These review comments are remaining <br />from the previous July 5, 2006 " 2"d Adequacy Review Comments" memo to Deb Gonima and <br />Carl Mount. <br />6.4.5 EXHIBIT E -Reclamation Plan <br />2. The applicant has committed to providing the Division with a copy of the QaQc Specifications <br />to be implemented during slurry wall construction prior to beginning construction of the slurry <br />wall. As part of this commitment, the applicant will need to provide the Division with a copy of <br />the specifications at least 30 days prior to slurry wall installation and provide the Division with <br />written verification of the date when slurry wall installation began. <br />3. Please address the following concerns with respect to the Groundwater Monitoring Plan <br />recommended by the Applegate Group. <br />b. Revised Map -The applicant has provided a copy of the Tab 14 Map ("Lake Reclamation <br />Exhibit") which shows the locations of three (3) proposed groundwater monitoring stations near <br />the western portion of the project. The map will need to be revised to include the location(s) <br />where mitigation measures such as perimeter drains will be installed upon a finding of a <br />groundwater level measurement of 4821 feet or higher, as specified below in Item 3c. <br />c. Baseline Data -The applicant has committed to using a baseline groundwater elevation <br />of 4818 feet, and a "trigger" of 3 feet. Therefore, upon a measurement of 4821 feet, the applicant <br />will need to begin implementing mitigation measures, ie: perimeter drains. The applicant's <br />commitment to collect monthly groundwater level measurements prior to installation of the <br />sluny wall will help to define the natural fluctuation of groundwater in the sun•ounding area. <br />If not already specified, the applicant will need to commit to notifying the Division within 48 <br />Office of Office of <br />Mined Land Reclamation Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.