Laserfiche WebLink
A <br />Scott, Crellin (KEC) <br />From: Foster_Beckett@blm.gov <br />Sent: Wednesday, June 01, 2005 1:22 PM <br />To: Scott, Crellin (KEC); Jorgensen, Alan (KEC) <br />Cc: rob ernst@blm.gov <br />Subject: Fw: Confirmation of request for additional Drilling for Lease Modification Area <br />Crellin S. <br />At the last meeting the additional drilling was mutually agreed to by Alan J., Rob E. and <br />Myself; and it was thought that the drilling could be done just south of the D-034365 <br />Lease Modification area on Lease D-034365. I talked with Rob Ernst and he thought that the <br />3-month window should cover the NEPA process baring any unforeseen addition work load in <br />this office. <br />Thanks Foster <br />----- Forwarded by Foster Beckett/CRFO/CO/BLM/DOI on 06/01/2005 12:57 PM <br />"Scott, Crellin <br />(KEC)" <br /><Crellin.Scott@ke <br />nnecottenergy.com <br />05/24/2005 01:29 <br />PM <br />Dear Foster, <br /><Foster_Beckett@blm.gov> <br />To <br />cc <br />"Garcia, Juan (KEC)" <br /><Juan.Garcia@kennecottenergy.com>, <br />"Young, Bob (KEC)" <br /><BOb.YOUng@kennecottenergy.com>, <br /><rob_ernst@co.blm.gov> <br />Subject <br />Confirmation of request for <br />additional Drilling for Lease <br />Modification Area <br />As per our last meeting on the Colowyo Lease Modification (D-034365) with BLM, Colowyo <br />understands that BLM is requesting an additional drill hole in order to more accurately <br />estimate and confirm geological and mineable <br />reserves in the lease modification area. Juan Garcia is compiling the <br />needed information for the exploration permit package in order to secure <br />the needed permit(s) for drilling in this area. Our understanding and <br />experience with exploration permits that are outside any of our lease permits, will take <br />approximately 3 months for processing and approval. <br />As you are aware, Colowyo is conducting these activities under an <br />"abatement action" corresponding to a Notice of Violation from CDMG. In <br />order to secure the mineral rights and right of entry for the lease modification area <br />Colowyo must supply the State with all the required permits demonstrating mineral rights <br />and right of entry permission. <br />