My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE34679
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE34679
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:31 PM
Creation date
11/21/2007 2:18:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
6/6/2005
Doc Name
Request for Abatement Extension
From
Colowyo Coal Company
To
DMG
Violation No.
CV2004001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/~ Kennecott <br />l ~ Energy <br />June 3, 2005 <br />Mr. Byron G. Walker, P.E. <br />Environmental Protection Specialist <br />Colorado Division of Minerals & Geology <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br />(303)866-3567 <br />Colowyo Coal Mine <br />5731 State Highvuay 13 <br />Meeker, Colorado 81641 <br />Telephone: (970) 824-1532 <br />Fax: (970) 824-159fi <br />Sr Environmental Engineer <br />RECEIVED °•"«°°s`°" <br />JUN p 6 2005 <br />Division of Minerals d Geology <br />RE: Request for F~dension on Response to NOV No. CV-2004-001, from Colowyo Coal Mine, <br />Permit No. C-81-018 <br />Dear Mr. Walker, <br />In response to Colowyo's NOV (No. CV-2004-001), abatement Item 3b of the notice, Colowyo respectfully <br />request an extension of 90 days to allow for the BLM to continue their review of the Lease Modification <br />request, dated August 18, 2004. <br />To date Colowyo has submitted a Lease Modification Application to the BLM and copied CDMG. Since <br />then BLM has completed their Environmental Assessment and are working on the engineering and <br />reserve estimate for the modified lease. BLM has hired a new Mine Engineer (Foster Beckett) in the <br />Craig, Colorado field office. BLM representatives Foster Beckett and Rob Enrst have both been out to <br />Colowyo to do a field tour of the proposed lease area and reviewed our geological and mineable <br />reserves. However, since drill hole data was lacking for the specific area in question, additional drill hole <br />information was requested. In order for Colowyo to conduct the requested drilling, additional exploration <br />permits\Iicenses for unleased lands will need to be approved by the BLM. Therefore Colowyo will be <br />submitting an exploration package to BLM in the very near future for their review and approval. Expected <br />timeframes for approval of the exploration license is 3 months. Colowyo will do whatever is possible to <br />expedite the permitting process in order to reduce timeframes. <br />Therefore, due to the steps required to acquire the necessary information for the application, Colowyo <br />requests a 90 day extension as per the Colorado Mining Rules and Regulations regarding abatement. If <br />you have any questions regarding this matter please call me. Thank you for your time and attention to <br />this matter. <br />SincerelC~~~~~~~ <br />C. Crellin Scott <br />Sr. Environmental Engineer <br />Encl.(1) <br />Cc: File: CF 17.6.4 NOV-2004-001 <br />Bob Young <br />Kelly Sanders <br />Dan Hernandez <br />Ameiope Mme • Coiovyo Mme • Cortlero Rolo bline • Jacobs Ranch Mine • Spnng Creek Mine <br />a memoer of [he Rio 'Pinto Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.