Laserfiche WebLink
I ~ Table D-1 <br /> Area to be <br />topsoiled <br />(acres) TS Volume <br />{yd3) <br />Pit 1 18.71 19,953 <br />Pit 2 10.86 11,681 <br />Pit 3 14.90 16,026 <br />Pit 4 17.22 18,521 <br />Totals 59.48 66,240 <br />The topsoil will be placed on finished slopes as they are made, eliminating the need for most <br />stockpiling. Only the very end of Pit 4 will need stockpiled topsoil, which will be retrieved from <br />the stockpile created at the start of mining in that pit, approx. 6800 cubic yards. <br />3. Haul Roads and Access <br />• It is planned that an access road will wind azound the land pads to access all azeas after <br />reclamation. The location of this road is not known and will not be accounted for in the <br />reclamation plan. As stated above, all land pads will be topsoiled, seeded and mulched. <br />1 S Road Pit February 07 E-3 <br />