My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08-14_REVISION - M1974052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974052
>
2003-08-14_REVISION - M1974052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 7:08:02 PM
Creation date
11/21/2007 2:17:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974052
IBM Index Class Name
Revision
Doc Date
8/14/2003
Doc Name
Request for Acreage Release
From
Varra Companies Inc.
To
DMG
Type & Sequence
AR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />[Amendment 1 -South -located on the North bank of Sombrero Lake] to <br />maintain access for these vehicles. <br />All lands should be released on Amendment 1, except for the stockpile, which the <br />operator intends to salvage, and one additional seeding of Corridor 3. The end <br />use that the landowner is making of the area is indicative of its suitability for <br />release. <br />N. Area N is adjacent to the NE corner of Dakolios. Snyder Oil has made an <br />end use of this area for its well. An agreement with Snyder Oil is provided with <br />this submittal to show that Snyder Oil has assumed responsibility Eor the <br />reclamation and environmental commitments for this portion of the property. <br />V. Areas over the Original Pit 1 area suitable for release are indicated. <br />Healthy and self-sustaining stands of whea#grass have stabilized this portion of <br />the site. The balance of lake area is shown, and as indicated below, resolution <br />over these areas with the State Engineer's Office is imminent. <br />If the 11.2879 acres of Area C need backfilling, as part of resolution with the <br />State Engineer's Office, the resulting warranty for revegetation would increase <br />the estimates provided by $ 2,688.78. The presently overbonded state of this <br />operation is more than adequate to meet this concern, but for the sake of clarity, <br />this provision is too theoretical to include in the warranty total at this time, but <br />like each discrete area, can be attended to easily, if and when necessary. <br />Portions of the Original Pit 1 were backfilled in an effort to comply with State <br />Engineer concerns over pre-law water. Augmentation of the material for <br />revegetation purposes is needed, and is provided for under this submittal. Local <br />nearby sources of Free cow and turkey manure are available, delivered. The <br />submittal accounts for the cost of spreading manure over suspect areas. Since <br />discing is already provided for, the measure is included without serious impact <br />to the cost effectiveness of such an application. The enhanced percent organic <br />matter of treated areas should be more than adequate to assure revegetation <br />targets. Soil testing relative to this consideration will occur. Analysis of the <br />manure is provided with this submittal. <br />The Office/Shop is actually a permanent end use, unaffected by extraction <br />activities, providing administrative housing and field support [including heavy <br />equipment repairs] for all Varra Companies, Inc. purposes and diverse <br />Varra Companies, Inc. -Pit 1 - DMG Permit M-74-052 4 <br />Addendum -TECHNICAL REVISION - OS/ 16/96. <br />
The URL can be used to link to this page
Your browser does not support the video tag.