Laserfiche WebLink
<br /> <br />refuse that had either been dumped or had slumped from the refuse <br />pile and the berm was breached. Both berm and ditch were <br />ineffectual in containing and routing surface flow to the upper <br />bench pond. Lack of diligence by the operator in maintaining the <br />refuse pile according to permit standards and regulations is <br />therefore advised. The NOV issue was not mentioned in the previous <br />complete inspection in May, 1993. <br />Good Faith: At this time no extraordinary effort or rapid <br />compliance is applicable for this NOV. The operator is required to <br />submit a technical revision addressing these issues by July 30, <br />1993. <br />Thank you for your consideration in this matter. <br />