Laserfiche WebLink
<br />1 Hernandez, who is the staff member principally in <br />2 charge of t his application, was seriously i:zjured <br />3 yesterday, and is not able to be with us here today. <br />4 I think the thing to do is to turn this ove:- to Fred <br />5 Banta, the division directo r, to address. ,9s you <br />6 know, some of you are aware , we have had a number of <br />7 motions filed. I think we need to have Fred clarify <br />e for us where we are, what needs to be done eat this <br />9 point. <br />10 MR. BANTA: There are two thaat have <br />11 come up since the last hearing that need to be <br />12 addressed. The first one is that since the last <br />13 hearing, the company, Castle Concrete, has Fxut two <br />14 requests to the Board, one of them having to do with <br />15 a request for permit issuance on the basis that the <br />16 law states that tixey are entitle3 to a perm:.t if a <br />17 decision. is not made within 120 days. The ?3card <br />18 needs to address tha*_ request. <br />19 Second is that Castle Concrete ha=_ <br />20 submitted the document objecting to the second <br />21 supplemental prehearing order. Ir. essence, their <br />22 objection is that the seco nd sunplexaental px• ehearins <br />23 order stated that off-site or all rock fall;; or <br />24 off-site effe cts would be a consideration i:; this <br />25 henring, they cbjected to that as bein5 one of the <br />a <br />MIDYETT REPOTTING SERVICE <br />(303) 424-2217 <br />