Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 13a <br />Date : 08/05/2002 <br />User : SSS <br />State :Colorado <br />County:Mesa <br />Site : 23 Road Pit <br />Permitfjob# :M-1979-089 <br />Abbreviation :none <br />Filename : M089-13a <br />Agency or organization name :DMG <br />Permit or other job action :AM-03 approval and recalculation of existing bond <br />Task description :Replace topsoil on max. 25 disturbed area of AM-03 <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cost/hour : $53.00 NA <br /> Operating cosUhour : $90.29 100 <br /> Ripper op. cosOhour : $0.94 10 <br /> Operator cosUhour: $30.65 NA <br /> Total unit cosUhour : $174.88 Total fleet cosf/hour : $174.88 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 23,527 LCY factor: NA volume: 23,527 LCY <br />Source of estimated volume :Assume 25 acres covered with avg.7" of topsoil <br />Source of estimated swell factor :NA <br />nF ~ t <br />a <br />HOURLY PRO UCTION Job CondiLOn Correction Factors Source <br />Average push distance : 300 feet <br />Unadjusted howdy production : 437.8 LCY/hr <br />Material consistency description <br />Parity consolidated stockpile <br />Average push gradient : 0.00 % (! <br />Average site altitude : 4,532 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net wrrection : 0.69 <br />Adjusted unit production : 301.55 LCY/hr <br />Adjusted fleet production : 301.55 LCY/hr <br />.M,.w..._-~_ . W, <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 78.02 Hours <br />Umt cost $0 580 /LCY Total lob cost $13,644 <br />~~ <br />