My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-08-12_REVISION - M1979089 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979089
>
2002-08-12_REVISION - M1979089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:27 PM
Creation date
11/21/2007 2:11:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979089
IBM Index Class Name
Revision
Doc Date
8/12/2002
Doc Name
Cost Summary Form
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 12a <br />Date : 08/05/2002 <br />User: SSS <br />Agency or organization name :DMG <br />Permit or other job action :AM-03 approval and existing bond recalculation <br />Task description :Rip max 25 acre disturbed AM-03 area prior to topsoil replacement <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />State :Colorado <br />County :Mesa <br />Site :23 Road Pit <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Selected estimating method : <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : <br />Area : 25.00 acres Rip depth (ft) : 1.50 Volume : <br />Source of estimated quantity :25 acre max AM-03 disturbance at any time <br />Source of estimated load factor : NA Area <br /> <br />NA <br />60,500 <br /> <br />BCY <br />BCY or CCY <br /> <br />HOURLY PRODUCTION <br />Alternate methods - ob Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,155.04 cu. yds./hour <br />Area : Avg. ripping depth : 1.50 feeUpass Site altitude : 4,532 feet <br />Average ripping width : 7.67 feefpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 500.00 feeUpass Job efficiency factor : 0.83 (1 shiWday) <br />Average dozer speed : 88.00 feeVminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.891 acres hour Adjusted unit production : 1,788.69 cu. yds./hour <br />Unadjusted production : 2,155.04 cu. yds./hour Adjusted Fleet production : 1,788.69 cu. yds./hour <br />~s .~. ~ G ~ ~__w <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 33.82 hours <br />Unit cost : $0.103 per cu. yd. Total job cost : $8,203 <br />Permit/job # : M-1979-089 <br />Abbreviation :none <br />Filename :M089-12a <br />
The URL can be used to link to this page
Your browser does not support the video tag.