My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-10-23_REVISION - M1988081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988081
>
2006-10-23_REVISION - M1988081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 2:09:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988081
IBM Index Class Name
Revision
Doc Date
10/23/2006
Doc Name
Comstock Mining and Refining Financial Warranty Increase
From
DRMS
To
Comstock Mining & Refining
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description CosUhour/unit (No. units) Cosi/hr/fleet CosUhr/fleet <br />-Light Duty Pickup, 4x2, 1/2 T. $41.25 1 $41.25 $41.25 <br />-Flatbed Truck, 4x2, 15K GVW $38.62 1 $38.62 $38.62 <br />Subtotals : $79.87 $79.87 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Boulder <br />Transportation Cvcle Time : Non- Total one-way travel distance : 10.0 miles <br />Roadable Roadable Average travel speed : 35.0 mph <br />Equipment Equipment <br />Haul time (hours) = 0.29 <br />Return time (hours} = 0.29 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 1.57 <br />0.29 Total non-roadable mob/demob cost * : $1,415.74 <br />0.29 ' Mro round fops with haul dg <br />NA Total roadable mob/demob cost ** : $45.64 <br />NA "one round top, no haul dg <br />0.57 <br />JOB TIME AND COST Total job time : 3.14 hours <br />Total fob cost : $1.461 <br />
The URL can be used to link to this page
Your browser does not support the video tag.