Laserfiche WebLink
Permit or other job action : Reevaluate Amount Of Required Bond <br />Task description : Mobilization/Demobilization <br /><: <br />,.:.: <br />EQUIPMENT TR9NSPORT RIG.COS"~ ,. <br /> <br />- __ _ _ _ -.---~-- <br />;:: <br />:< <br />Shift•bas~s - = 1 perday- -- - -~ <br /> Cost data source : CRG Data <br />Truck tractor description : Genedc on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2005) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownershipcost/hour : $25.36 $28.12 $34.53 <br /> Operating cosUhour : $38.07 $39.54 $43.02 <br /> OperatorcosUhour: $27.40 $27.40 $27.40 <br /> Helper cosUhour : $0.00 $21.55 $21.55 <br /> Total Unit CosUhour : $90.83 $116.61 $126.50 <br />Machine WeighUunit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br />Description (Tons) CosUhr/unit CosUhr/unit {No. units) CosUhr/fleet Cost/hr/fleet CosUfleet <br />-Cat D8R Series 11- 8SU 52.55 $53.92 $126.50 1 $180.42 $126.50 $0.00 <br />-Reveq. Eq. 20.00 $60.00 $90.83 2 $301.66 $181.66 $0.00 <br />Subtotals : $482.08 ~ $308.16 <br />