Laserfiche WebLink
15 <br /> • • <br /> 1 report, it says that if PD -- or PV is 9ndicated, you <br /> <br /> 2 should read the following pages carefully in order to <br /> 3 assure compliance to terms of the permit and <br /> 4 applicable rules and regulations. <br /> 5 h <br />f <br /> In t <br />e case o <br />hydrologic balance, <br />' E roads, erosion, sedimentation, off-site damage, the <br /> 7 staff specifically noted they were possible <br /> 9 i <br />l <br />ti <br />Wh <br />t <br />did <br />h <br />b <br />k <br />h <br />h <br /> v <br />o <br />a <br />ons. <br />we <br />a <br />w <br />en we came <br />, w <br />ac <br />en t <br />e <br /> 9 inspector returned to the office, we sent out a <br /> 10 reason-to-believe to the company that there were <br />1 11 ibl <br />i <br />ti <br />t th <br />th <br />t th <br />ld b <br />l <br />it <br /> poss <br />e v <br />o <br />a <br />ons a <br />ose wou <br />e <br />e s <br />e; <br />a <br /> 12 brought to the Board's attention. So the company was <br /> 13 put or, notice with the inspection report, then with <br /> 14 v <br />letter that went <br />th <br />fili <br />th <br />-t <br />-b <br />li <br /> e <br />ng <br />e reason <br />o <br />e <br />e <br />e <br /> 15 out, these were possible violations and would be <br /> lE brought to the Board. What staff has done, I <br />~'' <br />:• <br />~ 17 consierentwith the Board's <br />believe <br />is directl <br />~ <br />. , <br />y <br />. <br /> 1B boilerplate in the inspection report. <br /> 19 One item that was raised in discussion <br />' 20 " means when the <br />was what the term "severit <br /> y <br /> 21 boilerplate said the possible violation should be <br /> 22 corrected by the date given to reduce the severity <br /> 23 when considered by the Mined Land Reclamation Board. <br /> 24 I believe what that goes to, the amount of civil <br /> 25 penalty that if an operator -- typically, if an <br /> <br /> MIDYETT REPORTING SERVICE <br /> (303) 424-2217 <br />