My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-02-19_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
1992-02-19_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 2:44:11 PM
Creation date
11/21/2007 2:02:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
2/19/1992
Doc Name
Midterm Review Findings Document
From
MLRD
To
CYPRUS ORCHARD VALLEY COAL CORP
Type & Sequence
MT2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section III - Status of Stipulations <br /> (continued) <br /> Stipulation No. 6 <br /> The operator shall install and begin monitoring one monitoring well <br /> located at Drainage Node 22, as shown on Map No. 13. The well shall be <br /> completed within the bedrock below the surficial material within 60 days <br /> of the permit issuing. Water levels, pH, electro-conductivity, and <br /> temperature in this well must be monitored monthly as weather permits , and <br /> water quality samples shall be drawn quarterly for the parameters listed <br /> in Appendix A. This monitoring data must be submitted to the Division <br /> quarterly. The applicant shall submit to the Division a well completion <br /> report and monitoring schedule within 30 days after the well is completed. <br /> Resolved: Node 22(8-7) was drilled October 30, 1981 and the well <br /> completion report was submitted December 11 , 1981 . Results from this site <br /> are currently submitted on an annual basis . This stipulation is currently <br /> found as Stipulation No. 32 in the 1988 document. <br /> Stipulation No. 7 <br /> Within 60 days of permit issuance, Colorado Westmoreland, Inc. must <br /> provide the Division with a specific crop production standard for the <br /> orchard area. Pending Division approval , this standard will be used in <br /> evaluating revegetation success within the orchard vegetation type. <br /> Resolved: CWI submitted the final plan for evaluating orchard <br /> revegetation success on March 2 , 1982. This was approved by the Division <br /> on March 31 , 1982. <br /> Stipulation No. 8 <br /> Within 60 days of permit issuance, Colorado Westmoreland, Inc . must <br /> provide the Division with an appropriate, justifiable shrub/tree density <br /> standard which will be sufficient to meet the approved post-mining land <br /> use for the reclaimed surface. This standard must be based upon a <br /> recommendation from the Division of Wildlife, and must include the <br /> findings of the technical references/sources used to establish this <br /> standard. <br /> Resolved: CWI submitted a shrub/tree density standard to the Division on <br /> March 2, 1982. The Division approved it on March 31 , 1982. It can be <br /> found in Volume 9A of the current permit application. <br /> Stipulation No. 9 <br /> The operator' s quarterly surface water monitoring reports shall include <br /> the water quality testing parameters listed in Appendix A, Baseline Water <br /> Quality Monitoring. <br /> Resolved: CWI incorporated the Division ' s Baseline Data Collection <br /> Guidelines into Volume 4, Table 6, of their permit application. The <br /> testing parameters listed in Appendix A have been included in the surface <br /> water monitoring. <br /> -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.